On the question of new operators on the Channel rail Link I would take the opportunity to designate two new ones so that competition is ensured into the future.Though they could be any of the four possible operators mentioned I would go for two because you have to confront now upcoming problems which would limit the ability to increase competition in the future.
Since the hardest part of the route is to rebuild it (to increase capacity) I think that it has to be established what the present capacity is. That would obviously have to take into consideration the number of services per hour needed to satisfy present and foreseeable demand for Le Shuttle operations. This result would give us an idea of the probable limit to the number of train services that could be allowed for operations (1) to Paris, (2) to Brussels and Amsterdam, (3) to South of France, Switzerland and Italy,(4) to Germany and places east. Thus we could see what would be the probable limit each operator would be able to provide. That would give us the number of train sets, and so the need for stabling and maintenance facilities.
There are problems with the stabling of the fleet and maintenance facilities for new competitors. Access to Temple Meads is only part of the solution. I remember reading somewhere that there are possibilities for a new maintenance depot in the area of Old Oak Common which would help. Also if Virgin and the other operators were thinking of purchasing 12 sets of 200 meters then cannot a new depot be built also on the French or Belgian side? Thus the capacity of the operator could be increased to at least double.
The reason, I believe, that Eurostar services do not stop at Stratford, Ebbsfleet and Ashford is because the money loaned to the company during the pandemic demanded that the company drop any services along the route. Then it could only offer services end to end. If we want the potential of HS1 to be achieved then permission to operate along the line demands that the operator offers at least a minimum number of services which stop at the intermediate stations - perhaps two per day(minimum). Stopping at the three stations plus Lille might well be self defeating, resulting in operations which are slowed down too much. It could be better to offer services which stop at one of the three English stops plus Lille on each operation. Then we would end up with three services in the morning and three in the evening stopping at Stratford, Ebbsfleet and Ashford in turn while all three stop at Lille. Offering two operators we have competition and each station would have a minimum of 4 services per day. More services could be offered if the operators so desired.
The capacity of the destination stations has to be looked at too. I believe St.Pancras has seen the potential to double or even triple its present capacity. Brussles, Amsterdam and Paris have to be looked at as well.
With the introduction of new operators along HS1, how will they affect South Eastern´s Javelin services to north and east Kent? Supposedly, the vast majority of freight traffic travels at night. What would be the effect on freight traffic during the day when passenger services run? Just some of the things to look at.
No comments:
Post a Comment