31 January 2013

High Speed Rail Lines - how to focus (The Scottish Connection) 1/3

This is the first in a series of 3 articles about High Speed rail in the UK.

Since the publication of the government´s policy document in January 2012 entitled "Review of the Government´s Strategy for a National High Speed Rail Network" I thought it time to review the situation and publish this blogger´s thoughts on the matter. I was on the point of publishing the first article when the government came out with its latest proposals concerning phase 2 of the project - the extensions of HS2 from Birmingham to Manchester and Leeds. These were published 28th January 2013 under the title "HS2 phase two initial preferred route plan and profile maps"

The first of the three articles dealt with, specifically, HS2 so needs to be updated to take into consideration the latest information. It will, therefore, be published second. Thus this article, still valid, is published first.  


This blogger works under some assumptions.
-we wish to have faster trains to the most populated parts of the United Kingdom so that rail customers can travel safely, in comfort and at reasonable prices to the most densely populated parts of the country;
-The country is (relatively) small and densely populated so any new lines (long or short) have to be carefully thought out so as to make as small an impact as possible on (in this order) homes, other residential areas, other important property, industry and workplaces, recreational areas, and the unspoilt countryside in general;
-Existing transport infrastructures and their corridors should be used as much as possible to reduce the impact of new construction;
-New transport projects should work to connect existing transport nodes and promote the use of public transport so as to reduce the dependency on private car transport;
-Any new transport construction should be developed so as to make the most efficient use of energy, and reduce the toxic and noise pollution from the most offending vehicles,thus leading to their reduction in use and the liberation of space on public ways.
-The existing rail corridors should be recognised as such, and therefore, accepted as being the main arteries of the country. They should all consist of four tracks of rail (next to or near each other) so that there can be a separation of fast rail from regional, local and freight services but interconnecting in case of need (for emergencies or maintenance). 

What this blogger rejects are...
-speed for speed´s sake
-projects which demand great quantities of resources over and above what is necessary to provide a good, reliable, quick rail service
-projects which marginalise a large proportion of the population unnecessarily
-projects which promote private car transport thereby defeating the objective of clean, environmentally friendly  transport
-projects which carve up and scar the countyryside where alternatives exist 
-projects which become self serving to the interests of political, financial, technical and legal groups to the detriment of the public good.
-nimbyism for nimbyism´s sake.


----------------------------------------------------------------------------



When many people, particularly politicians,  talk about High Speed Rail they refer to connecting the far reaches of the kingdom to the capital thus reducing travel times, adding wealth to the economy and reducing the need to use other forms of transport which are more polluting.
With fast travel times, for freight as well as passengers, then the advantages of using the trunk roads and motorways with private transport is much reduced. If prices are reasonable then the attraction of using fast rail transport increases substantially. This has been proven on every rail line where the speeds were increased.

We encounter troubles when we try to marry these desires of greater speeds to the benefit of the greater number.

The benefits of obtaining lower travel times between cities has already been shown to be a long term project. The proposed HS2 programme from London to Birmingham will not come to fruition until  2026, thirteen years hence, if and when it becomes operational as envisaged.
The second phase  from Birmingham to Manchester and to Leeds would not be open to the public until 2033 as published by HS2 Ltd., the government agency charged with planning and building the project. All this assumes that there are no delays to which public construction projects are prone.


What this blogger proposes is to attack the problem of long travel times over the trunk routes to Scotland where the problems of line speed and curves are greater. Add to this that great extensions of new lines together with updating of classic lines will have to be done at some time. If the promises made to run the lines up to the two main Scottish cities are to mean anything, on projects which will take a long time to implement, then do them now, or they will never be done.

To achieve substantial increases in speed and lower travel times the following can be done on both the WCML and the ECML. The results are explained below in the areas to be developed and the route kilometres reduced.

-The maps show the new route(NR) in colour purple
-the updated lineson classic routes (UR) - from 2/3 track to 4 track in green
-the lines to be updated and some short sections straightened  in blue
-(CR) Classic route in black

------------------------------------------------------------------------------------------------------------   



WCML:
Running on the classic line to a point 4.23 kms. out of Glasgow Central station and then on a new 2 track line to complement the present WCML.

Glasgow (Rutherglen) to Gretna:                                                               (line reduction
                 2 track new               (CR): 145 kms.              (NR) 120.0 kms.              25 kms.)
Gretna  to Carlisle station:
                                                (UR) 2 to 4 track                      15.6 kms.
Carlisle South to Shap South
                2 new tracks to update to 4 track plus straightening the line in six places including a bypass round Penrith
                                                 (CR):     47.5 kms.           (NR)  45.2 kms.     (reduction 2.3 kms.)
Shap  to Kendal                      (CR):     26.8 kms.           (NR)  18.3 kms.     (reduction 8.5 kms.)
Kendal to Lancaster
               from 2 to 4 track plus straightening of lines in three places
                                                 (CR):     34.2 kms            (NR)  34.0 kms.     (reduction 0.2 kms.)  

*****TOTAL:                                (CR)   269.1 kms.           (NR) 233.1 kms.    (reduction 36.0 kms.)


According to the present timetable the fastest trains from London to Lancaster take 2hr 25 mins. (with three intermediate stops) while the next fastest taking up to 2hr 30mins. (with three stops).
The trains from London Euston to Glasgow are timed between 4hrs. 30mins. and 4hrs.48mins depending on the number of stops (six to seven).
                         
It is, therefore, logical to assume that on new and improved lines the distance being from Lancaster to Glasgow about 235 kms.(147 miles) then the running time can be, at a very conservative estimate, one hour or less including stops.

With the improvements from Lancaster northwards added to the improvements which can be made southwards then we can be looking at a running time from Euston to Glasgow in the region of 3hrs. 30 mins. or less - which is what the original objective was - very competitive with the airlines..






ECML
a completley new 2 track route out of Edinburgh Waverley 

Edinburgh Waverley to Newgraighall (crossing the A1 trunk road)
                                  Updated route (UR) to 4 track                                     7.33 kms.
Newgraighall to Newcastle Airport:
a completely new line going as close to the Northumberland National Park as permits reducing the distance over the route substantially. and opening up the Borders for regional rail transport.                                                                                                                                                                      (NR) 143.0 kms.
Newcastle Airport to Gateshead
an underground connection under the Tyne to miss out the complex rail pattern in Newcastle City Centre. Obviously trains originating in Newcastle would leave from the City Centre station.                                                                                                       (NR)    11.5 kms.
*****TOTAL:
Edinburgh Waverley to Gateshead
    via Dunbar, Berwick &  Newcastle Central
                                      (CR)203 kms.                         (NR) 161.83 kms.   (reduction 41.17kms.)
                                   


Gateshead to Team Valley Trading Estate:
                  (UR) from 2 to 4 track                                               2.9 kms.
Birtley to Durham North:                          
                  (UR) from 2 to 4 track                                             11.6 kms.
Durham bypass (Pity Me to Shincliffe)
                  2 track new                                                 (NR)      6.5 kms.
Shincliffe to Cornforth Village
                   (UR) from 2 to 4 track                                              4.8 kms.
Pity Me to Conforth Village
                    via Durham       (CR)  14.7 kms.              
Mainsforth  to Brafferton:
                   2 track new          (CR) 13.7 kms.              (NR)    11.2 kms.
Brafferton to Darlington North:
                 (UR) from 2 to 4 track                                               5.35 kms.
other unmodified track                                                               7.65 kms.

*****TOTAL:
Gateshead to Darlington:
                                              (CR)  55.9 kms.                   (NR) 50.0 kms.     (reduction 5.9kms.)


ECML   Edinburgh - Darlington
According to the present timetable the fastest trains from London to Darlington take 2hr 20 mins (with one stop) while the next fastest take 2hr 35 mins. (with four/ five intermediate stops).
The trains from London Kings Cross to Edinburgh are timed between 4hrs 22mins. and 4hrs.44mins depending on the number of stops (four to eight).
                         
It is, therefore, logical to assume that on new and improved lines the distance being from Darlington to Edinburgh about 220 kms.(137 miles) then the running time can be, at a very conservative estimate, one hour or less including stops.

With the improvements from Darlington northwards added to the improvements which can be made southwards then we can be looking at a running time from Kings Cross to Edinburgh of under  3hrs.30mins. - which is what the original objective was- very competitive with the airlines.

WCML Glasgow to Warrington  - ECML Edinburgh to Doncaster
From the map above you can see that the major works necessary are from Lancaster and Darlington northwards.  That does not subtract from the fact that probably the biggest bottleneck on the ECML is the two track path through Welywyn Garden City which must be increased to four track (at least) as soon as possible. 


WCML Warrington to Euston - ECML Doncaster to Kings Cross
 

The ECML needs to be four tracked(at least) from Darlington southwards along its whole length with some line straightening.
-Darlington to Northallerton -                                      22.0kms.
-North of York (Skelton)                                               0.6kms.
-South of York to Doncaster                                       42.6kms.
-Doncaster to Retford in three sections totalling          22.85kms.
-upgrade and straightening south of Retford                18.8kms.
-North and south of Newark                                        32.0kms.
-Grantham                                                                  8.55kms.
-south of Peterborough                                                25.7kms.
-plus the necessary upgrade to 4 or more tracks at Welwyn garden City  4.5kms.
                                                                   TOTAL:   177.6kms.

The only part of the upgrades which is urgent is the 4 tracking of the line through Welwyn Garden City.  However, these works, done over the mid term, would ensure the line capacity for the future enabling the separation of intercity passenger traffic from regional and freight traffic.       




The WCML encounters other problems south of Lancaster. Four tracking to Crewe.
-Lancaster to Preston                                                        32.3 kms.
-Euxton South to Wigan NW                                              12.4 kms.
-Lowton to Winwick                                                             4.6 kms.
-M/C Ship Canal to Acton Bridge                                        13.0 kms.
-Weaverham to Winsford                                                      9.25 kms.

                                                                              TOTAL:  71.55kms.

These works are a must which cannot be left off the agenda for a long time. Though they are not yet urgent they will be after the newly electrified lines northwards from Liverpool and Manchester to the WCML become operational coupled with the natural growth in inter-city, regional and freight traffic.


The busy junction at Crewe itself with many lines crossing on the flat makes for reduced operations. Here a north-south underpass (of only 4.5kms) would facilitate speed for non-stop trains through the junction.
The separation of the Manchester line from the north-south line can be done....
(a)on the flat,
(b)with a bypass on the flat flanking the town
 or, my preference (because of intrusive viaducts and noise pollution) (c)it would best benefit from the same north-south underpass.

Stafford would also benefit from an underpass (4kms.) to reduce the curvature of the line for non-stop trains through the town. This would increase line speeds and ensure the town does not suffer major works.
Add to this two short sections (totalling about 8kms.) north of the town together with a section to be fourtracked and straightened (6.23 kms.) to the south and line speeds can be maintained at high levels for through traffic.

The Trent Valley section has to be fourtracked all of its length as there is still some (12kms.) (south of Nuneaton) which is only three track.

The section from Rugby to where the Northampton branch(south of the town) rejoins the WCML (at Roade) needs to be fourtracked from two (34 kms.). This would alleviate the usage of this section by freight and regional trains as well as the inter-city fast ones.
These works from Crewe southwards would total 68.73 kms.

These developments would satisfy much of the present traffic forecasts without any other construction for a mid-term period but on their own they are not the long term solution. That only comes with these together with the other developments on other lines to satisfy demands for the rest of the century. However, these measures can be taken both on the ECML and the WCML in the next twenty years.



The conclusion reached is that so much can be achieved by looking northwards to Scotland. The desired line speed increases can be obtained by looking at the less developed part of the rail network, in the more difficult terrain. Of course, it is going to be expensive to build but these developments can be achieved in a relatively short period and are for the long term. If the bean counters had had their way in the 1830s-40s then neither the ECML nor the WCML would have reached Scotland. Let us not fall in that trap of being under the bean counters..

These upgrades and (relatively) minor new works are far less disruptive than driving straight lines through housing, businesses and beautiful countryside and which will only provide stops two or three times(at most) on the journey. We do not want point to point passengers from London to Glasgow/Edinburgh only. We want more passengers travelling between stations along the route to where they want to go. Minors and pensioners tend not to be drivers so find out of town Parkway stations a hindrance more than benefit. It is no problem to use the classic lines to enter the city centres  where the vast majority of the people want to go or catch public transport for onward travel. Emphasising this means that the customers (which are to be SERVED - let us not forget that) get what they want, where they want it and will help reduce the number of cars on the roads. This way a greater number of potential passengers is catered for, over a wider area, at a lower cost both financially as well as environmentally.

I emphasise  that by focusing this way the much yearned for connections from Scotland to England will get built and that blessed country will not be left out on a limb as has been so frequently in the past.





 

28 December 2012

HM e-petitions - some which are still open.

Her Majesty´s government, in a effort to act more transparently and within the ways of thinking of the voters, has been using the possibility of presenting petitions online to the government. The aim is to give voters the way to express their opinions over a wide variety of issues with the most supported gaining a voice in the House of Commons. This aspect of British democracy is not that widely known or used.

Since this blog is devoted to transport issues in the UK this blogger thought it might prove useful for readers to see some of the petitions which are still open and thus able to be adhered to for those who wish to. Obviously, this list, though extensive, is not comprehensive. I have used the petitions pending, only at the Dept. for Transport and not those which might be found at other offices or departments. The total number of petitions at the DfT is 675 while for the whole government it comes to 6315.



The most successful petition open at the moment is that dealing with the Virgin Trains fiasco, when it was going to be discharged from its duties as a rail franchisee to be replaced by the First Group. As readers will remember this has provoked a scandal at the Department for Transport, leading to the suspension of the proposed change and Virgin Trains remaining the franchisee for the next two years. It can still be signed up to mid February.
Reconsider West Coast Mainline franchise decision.

However, that petition is not the only one dealing with
rail franchises.
Reinstate Virgin Trains WCML

West Coast rail Franchise

Do not renew West Coast's Franchise 

Do not reconsider giving First Group WCML Franchise

Take West Coast line from Branson's Virgin 

Government to pay for West Coast failure

West coast rail line public money 

DO NOT PAY COMPENSATION TO WEST COAST RAILWAY BIDDERS


These do not mean that commentators are not concerned about other franchises
Users of train services to have bigger say over franchise renewals

Introduce public consultation into rail franchising 

Review First Capital Connect's franchise

Abandon rail franchising and hand all existing franchises to state-owned Directly Operated Railways as they expire.

Nationalise the Railways of Britain

Bring back British Railways

nationalise railways

Make public transport state owned across England and Wales

Keep The East Coast Mainline Rail Franchise In Public Ownership

Abandon East Coast Mainline franchise and run the line on an open access basis

Southestern Railway Metro Line Passenger Campaign

London Midland - Should Be Stripped of Contract 

London Midland should face disciplinary action

London Midland Franchise to be Removed 

Strip First Capital Connect of Thameslink Franchise Immediately

Stop Greater Anglia Franchise Renewal

Punish walking away from rail franchises with a ban on bidding for Government contracts

Train opperators who have mismanaged previous franchises should not be able to bid for current trainline franchises.


High Speed Rail link and other rail investment.

HS2 Alternative Route (Bow Group Route)

Introduce HS2 prior to 2033.

No to HSR2 Yes to Superfast Broadband 

Re-build Great Central Railway instead of building HS2

H2O not HS2

Stop HS2 in the Chilterns

If High speed rail (HS2) is built ensure UK trains are used

HS2

HS2 to stop at towns on the way to Birmingham

Rail Link £32b HS2 Good Idea but cost will end up £64b as always Govt project are late & cost will double.

17 Billion spent on HR2 would be better spent on Truck Roads and Cycle only lanes

Defence Cuts v. HS2

hs2 heathrow hub ltd

Citizenship Assessment Stop HS2 campaign

A demand fair Compention for Compulsory Orders for HS2


Though not all refer to HS2

MANCHESTER NORTH HUB  

Lower Rail Fares: Disband Network Rail and hand all infrastructure to the train companies

Investigate the benefits of Maglev technology

FULL HIGH SPEED RAIL FOR THE NORTH EAST

High Speed Rail to North East and Scotland


Time for the Government to take into account the infrastructure problems in South East Essex

More carriages for cross country train service 

Creation of a Eurostar Hub in Leicester

Bring the £9.5 Billion rail investment forward

Electrify the Weston super line as Bristol is just not far enough

Extend the electrification of the Trans Pennine route to Kingston upon Hull

why is the government subsidising rail companies?

Increase the frequency of rail journeys between major cities and surrounding towns. 

The UK Government to stop subsidising the rail link to Scotland if Scotland goes independent.



Most in this section refer to Heathrow and the possibility of an airport in the Thames estuary, though some would castigate certain politicians by building a new airport in their constituencies.
Airports/airlines:

Say NO to the Thames Estuary Airport!
 
Peak Oil and Airport Expansion

Charges for pick-up and drop-off parking at airports

All faces uncovered at airports, shops and city centres

Restrict the Number of Flights into Heathrow Airport

Stop Heathrow 'Freedom' Trials over Fulham, Putney and Barnes 

Expand Birmingham Airport instead of Heathrow

STOP A 3RD RUNWAY AT HEATHROW AND GOVERNMENT WASTING MORE TAX PAYERS MONEY ON THIS

Build The Severn Barrier and new London Island Airport now

Put in place a strong and long term decision regarding the expansion of London's airport capacity before 2015

Build a new commercial airport in Tim Yeo's constituency

Stop Heathrow Operational Freedoms Trial with immediate effect - all areas

Build a third runway at Heathrow.

A New International Airport between Bristol & Worcester

Estuary Airport at the Hoo

Build the 'Boris Island' airport rather than HS2

London and South East airport expansion.

boring "air traffic"

Thames Estuary Airport - Move west rather than east

The Civil Aviation Authority is not fit for purpose

Build A New International Airport in David Cameron's constituency

Is the Davies Airport Commission fit for purpose, considering it will take two and a half years to deliver their findings?

repealing liquid law on flights

Provide a smoking area at UK Airport

Airport Security Staff should not be employed by the individual airports owners.

Reciprocity in airline/infrastructre takeovers 

What can be done about aircraft noise? Petition for aircraft noise to be classed as a statutory nuisance.

package airline seating arrangements


This section deals with a real pot-pourri of subjects, though most refer to roads and road traffic.
Miscellaneous :

A1(M) upgrade.

Project Alexander: dual the A1 from Morpeth to Berwick

Stop the proposed destruction of the world's first passenger railway line in Manchester by Network Rail's Ordsall link aaand alternatives be found.

save manchester mayfield station

Reduce The Driving Age To 16

Fuel Cost in Rural Areas Needs Discounting

NO to London formula one proposal

Use this recession (spare construction capacity, lower costs) to build new motorway between London and Cornwall

Amended Action on the M62 Managed Motorway Plan

INDUSTRIOUS NORTH OF ENGLAND Fix the M62 and improve GDP

Remove seven bridge toll

Scrap the Severn bridge toll charge

The Future of Tolls on the Severn River Crossings 

CRUISES TO THE FALKLANDS

Improve transport links within Falklands. 

Implementation of a completely driverless system for the London Underground

forces travel

British Armed Forces Free Transport

Add a junction to the M4 between 2 and 3 (near Chiswick roundabout)

Use this recession (lower costs, spare construction capacity) period to build new motorway to fill obvious gaps and complete the existing network.

A5 Hockliffe Bypass

The State Of Rail Travel In Lincolnshire

Trains should have adequate seating for 2nd class passengers

Surrey Bus Services within M25

Save Mersey Ferries

re openkildwick and crosshills railway station

Bus Passes That Work Across The UK

Somerset & Dorset railway

Timetable fast South West Train services from Ascot to London Waterloo and vice versa.

Raise the speed limit on the M6 toll to 80mph

Ban private cars from UK roads 

Preventing disruption to train services due to weather

Increase Speedlimits on British Motorways to 100Mph

M64 - Stoke on Trent to Leciester. Congestion in stoke is ridiculous, as a result of cars clogging the streets, please help my city, please help me.

Create a motorway link from M54 to Welshpool

A40 between Oxford and Witney

Trains inspections and money devolution for delays and poor service in the national trains

A12 improvements London to Ipswich

Improving the Ipswich stretch of the A14

Dartford River Crossing - tolls on northbound carriageway only 

Improve Traffic Flow At Dartford Toll Crossing

Replace tolls at dartford crossing with congestion tax style technology

Scrap the Dartford crossing tolls

Stop the Toll increse of 50p in October 2012 & 2014 for the Dartford Crossing Kent & Essex

Rename Dartford Crossing the Dick Turpin Way

ban new toll roads

No tolls at Blackwall tunnel

New River Crossing between Essex/Kent

Petition for an extra train carriage on the Tarka Line (from Barnstaple to Exeter and vice versa)

Later running trains and tube

Search and Rescue Helicopter for N.Ireland

Do not nationalise Search and Rescue

Scrap Budget Airlines' hidden charges

Lack of transport in rural communities

Make public transport state owned across England and Wales

Re-Nationalisation of London Buses

End aviation subsidy

Campaign against short hop air travel 

Re-open the disused Wisbech &  March Railway line

Reinstate the Lewes - Uckfield Rail Link

Reconnect the Pickering to Malton Rail Link

Preservation & Reopening of the Llangollen to Ruabon Railway 

Introduce a half hourly Wrexham Bidston rail service

Stop Thameslink/Wimbledon loop terminating at Blackfriars

Protect Disused railway track beds from development

Save Preston Bus Station

Stop Preston City Council Demolition of Bus Station

Change the definition of an 'on time' train
 

As can be seen there are many petitions pertaining to the same subject. This is despite the website insisting you look for another petition on the same subject before you submit one.

For me it just goes to show how a government can deluge us with lots of information about a subject which we end up not reading in case we have an opinion about it. Thus its effectiveness as a democratic tool is reduced..

However, I still consider this to be a positive way of voicing opinions, and can be used much more in the future.

Please note that you can sign more than one petition if you are so inclined - even if the subject is the same.
 





 

20 November 2012

Luton - a viable alternative hub to Heathrow



As I mentioned in the previous blog (18-10-12), in the document presented on 5 October 2012 by  Policy Exchange called "Bigger and Quieter: the right answer for aviation"(written by Tim Leunig of Centre Forum) there was an alternative offered to a third runway at Heathrow . The author firstly proposed a four runway airport situated further west at Heathrow. The previous blog is my answer to that. I basically consider it to be too ambitious and so unlikely to be ever considered seriously.


The other alternative offered to the lack of runways in South East England was to expand Luton into a four runway airport. I originally proposed that idea more than two years before - 5th July 2010 - "Luton - The Next Best Bet ?" However, there are major differences which will be pointed out.

Luton airport´s own proposals:
However, let us look at what Luton airport itself is proposing for its future. On 16th January 2012 the operators of Luton airport called for ideas/opinions about the future. In an article titled "London Luton Airport seeks to expand capacity" (Breaking Travel News) the company wanted  to look at the possibility of increasing the airport capacity by over 50% to about 18 million/pax/annum  The result was the setting up of a project with its corresponding website called ‘futureLuToN:Optimisation’ and the revised masterplan which was published September 2012. Obviously the brief to design the plan was to develop the airport within the present limitations imposed by the government. Thus the plan envisages better use of the one runway within the present physical boundaries, but with better distribution of all the services provided at the airport.

The reason it is called a revised masterplan was because earlier the Luton airport operator (LLAOL) produced a masterplan to add to the government´s paper of 2003 about runway use in the South East. The Luton Airport Masterplan of 2005 used a development brief published in September 2001 but this was subsequently withdrawn in 2007 as being too expensive.

Other proposals:
There has been another proposal, by London architects Weston Williamson, to expand Luton Published in the London Evening Standard 24-10--2012 "Heathrow battle: How Luton could be ‘England’s airport’ - Proposal for a nationwide hub with four runways is unveiled" though not everyone is in favour.



four runway Luton airport (looking Eastwards)                                                          (c) Weston Williamson
As can be seen from the illustration Weston Williamson plan the airport as having four runways just south of Luton and next to the Midland Mainline railway (MML)

To operate independently each runway has to have a  separation of at least 1035 meters from its next parallel one. This enables each runway to have landings or take-offs irrespective of what is happening on the next parallel runway. Mixed-mode is another system of operation whereby one runway is used for both landings and take-offs at the same time, such as is the case of Gatwick at the moment. In the picture shown above, two pairs of runways are in use at a minimum of 380 meters between each pair. Of each pair one is used for landings and the other for take-offs. The plane ready for take-off has to wait for the other runway to be clear i.e. the landing plane has to have cleared the runway on to the taxiway or be just ready to do so. This means that the usage of the pair of runways is more intensive than mixed-mode but less than two independent runways. It is the way the two Manchester runways are used at present which are 390 meters apart. This way of operation, of course, limits the usage of the runways but uses less land.

The Policy Exchange/Centre Forum proposal:
Tim Leunig for Policy Exchange proposed something similar. The first suggestion was to place the runways at Luton Hoo. This is the area between the MML and the M1 motorway. Since this is controversial - Luton Hoo being a historical site, as well of lack of space - he also proposed an alternative site to be east of the MML as is Weston Williamson´s. There would be a terminal station straddling the MML and a road link to the M1 motorway. A  light rail system, similar to the Docklands Light Railway (DLR) in London would run a shuttle between Tring on the West Coast Mainline (WCML) via the airport to Knebworth on the East Coast Mainline (ECML).

 Most of the ideas for this secondary proposal are good and should be read in detail. The details are given in the document   "Bigger and Quieter: the right answer for aviation"
on pages 53 to 56. However, it should be pointed out that there are no illustrations (as there are for the Heathrow project) and he does draw heavily on ideas already expressed in the Heathrow plan.

This blogger´s biggest objections are two. One is to his idea of a light railway to connect the WCML (at Tring) to the airport and then on to the ECML (at Knebworth). The idea has its value, which he expresses, in that it is easier to build, can turn tighter corners and can negotiate bigger gradients. That is true but it ignores one major consideration - connectivity - which this blogger has been propounding for a long time. The other objection is that if we are going to build a a big megahub to serve the country for the next century why put limitations into its use? If the idea is to build four runways then let them be independent ones so as to maximise their potential use.   


This proposal:
The map image below (courtesy of Google Earth) shows how this blogger envisages the layout between Luton and Harpenden, and between the airport and Stevenage. It should be pointed out that to the west no population centre of note is affected until Aylesbury which is at a distance of 28kms.(In comparison that is the distance from the end of Heathrow´s northern runway to the Thames at the Isle of Dogs/Docklands). This means the noise would be less than bothersome for the good people of Aylesbury.

The distance from the MML to the end of each runway is calculated at about 4kms. This would include the present extended runway and three new ones further to the south towards Harpenden. The length  of each would cover the necessities of runway length, overuns and runway approach light emplacement. The distance between each would be 1100 meters (greater than the minimum of 1035 meters facilitating independent operation with taxiways and the building of a terminal with satellites in  a "toast rack" formation. In comparison the distance between the runways at Heathrow is 1420 meters.

Obviously, a start would be made by building the second runway and then extending the present one with the appropriate taxiways. The present terminal buildings would be used during the construction stage but the main terminal would be between the first and second runways together with the rail links. When the runways, terminal, rail  and road links are finished then the present terminals can be closed  and the service, cargo and maintenance facilities transferred to new buildings south of the second runway, while the present site is sold off for development. The third and fourth runways would not be built immediately but when demand dictates it. In the meantime the necessary land would be reserved for future use.

With the services south of the second runway and eventually between the second and third, their, relatively easy, access to the four runways is assured. With the building of the third and fourth runways then a new terminal and satellites can be built  between them. This way operators would use either the northern terminal (using the first and second runways), or the southern terminal using the third and fourth runways. Such would be the case that no cross -runway traffic would be necessary.  Thus there would not be a proliferation of terminals just two large ones with their attendant satellites. Any extra services which might be needed would find room south of the fourth runway (just north of Harpenden). 


The area bounded by Luton, Harpenden and Stevenage showing the layout of the four runways and a possible route for a train link between the MML and the ECML.
Noise:
One further consideration must be taken into account. Since the site can be planned as a whole from the word go then mistakes made in previous generations must not be repeated. By this I mean no new building, especially of residential property  must be permitted under the flightpaths at both extremes of the airport´s four runways. As a benchmark it would be prudent to prohibit any building west of the  A1(M) trunk road. the same can be said for the area west of the runways up to, at the very least the M1 motorway. In fact it might well be more prudent to extend the limit westwards to the A4146 and B4506 roads just to the west of Whipsnade.Though such construction is unlikely it is surely better to enforce it from the beginning so that there is no encroachment.

The distance from the end of the runways to Stevenage is (at its nearest point) 8kms. To give you an idea of the equivalent distance from Heathrow, 8kms. is from the end of the southern runway to the river Thames at Isleworth. This means that not an inordinate amount of noise would be suffered under the flight paths. Together with better designed aircraft and engines of the newer generation aircraft, and a steeper approach for landing the noise levels would be decreased further(as explained by Tim Leunig). In fact the measurement was made up to the edge of the A1(M) trunk road so the noise created by traffic on that road would be more of a nuisance than aircraft noise at that point.

Connectivity: 
Usually everybody looks at the connections from the airport to "London". This is quite understandable since one supposes that the vast majority of passengers would originate from/to London. I think, however, that the other connections are more important to look at,initially, since they also determine the traffic to the airport and they often get forgotten in the plan. This plan is a part and parcel of the whole so should not be ignored which is why I wish to mention it first. The success of a venture is not necessarily as a result of the prime market - please take note.

As you can see from the map below we have shown various solutions to the problem.

(a) the connection : Airport- Stevenage:
This is an essential connection to the ECML. Tim Leunig´s document suggested a connection from the airport to Knebworth. I reject this. The distance might well be shorter to connect to London but it does not solve the connection problem. Knebworth only has connections with First Capital Connect(FCC) (Regional) trains. On the other hand Stevenage is an important stop for FCC, First Hull trains, East Coast and could well be a stop for Grand Central trains. To demand a change in stopping patterns is too much in such a short distance. Thus what we will have is a good service from points north to have a one stop connection to the airport.

There are three possibilities to connect westwards to the WCML. Here we consider that the connection to the WCML should be at Milton Keynes. The reason is the same as mentioned to Stevenage. Milton Keynes provides regional services with Southern (and its eventual inheritors), London Midland, and intercity services with Virgin trains(and its inheritors?). The possibilities of providing connections for employment at the airport are also increased by the connections at Milton Keynes and Stevenage.

Consider the three possibilities from south to north:

(b) there is an existing (unused) rail line from the MML at Luton to Leighton Buzzard. The rights of way will already exist and so the reconstruction would not be excessive. The re-construction of the line involves 19kms. some of which can be easily rebuilt and some is already occupied by other buildings. It is a single track railway so either it should be double-tracked or passing sections would need to be provided. An advantage, not to be ignored, would be the possibility of offering local services at Dunstable and Leighton Buzzard on the route. However, it should also be mentioned that the route is rather tortuous so the maximum speeds attained would not be be so great.The overall distance from the airport to Milton Keynes using this way would be about 39.6 kms.

(c) This route would separate from the MML north of Luton town about where the MML touches the M1. It would be a completely new line to just north of Leighton Buzzard of about 14 kms. in length of new construction. There would be no substantial interesting populations to serve along the route so could work out a more rapid route than the previous option.The overall distance from the airport to Milton Keynes using this way would be about 38.2 kms.

(d) The third option is to use the MML up to north of Flitwick from where a cord can be built to the Bedford-Bletchley line. The new construction would mean about 6.25kms. of new rail (by far the shorter distance). A new cord would also be necessary at Bletchley to connect to the WCML but would be of about 750 meters. So the total new construction would be no greater than 7 kms.The overall distance from the airport to Milton Keynes using this way would be about 43 kms. The advantage of this route is that the line from Bedford to Bletchley has or / is being upgraded for freight traffic with double track so increasing the capacity. This means that the adaptation to new workings, track, ballast, signalling and resulting line speed, is the least onerous. For these reasons it is my preferred option.


The area between Milton Keynes, Luton airport and Stevenage showing the rail link to Stevenage and the three possible routes to the WCML



New services:
Whichever option is preferred the possibility exists then of providing semi-express or even local services between Milton Keynes and Stevenage via Luton airport. This would serve four groups (i) those wishing to connect from the WCML(at MK) from the north (ii) those wishing to connect from the MML (at Luton)  (iii)those wishing to connect from the north via Stevenage from the ECML and (iv) those who live in the area and wish to work at the airport or even wish to have better regional connections,(v) and other possibilities onwards.
Connection to London and ...:
This is what people look at firstly. The present service from London St.Pancras is provided by East Midland trains(EMT) and FCC. FCC services also run from there to south of the Thames, even to Gatwick airport and Brighton. That is a good connection. However, because of the present track layout trains run to Luton Airport Parkway before continuing northwards, when there is a direct airport connection the rail traffic pattern would have to change.

(e) this blogger envisages a rail traffic pattern where trains run from Brighton (possibly), Gatwick (most certainly) through central London (Elephant & Castle(?), Blackfriars, City Thameslink, Farringdon, St.Pancras)  on to West Hampstead and Luton airport. Of course there would be a return service in the reverse direction. However, this blogger envisages that any service would continue from Luton airport to Stevenage, Finsbury Park, and (either) Kings Cross or Moorgate (via Highbury & Islington ). This latter option would be interesting for potential customers in the City. However, though feasible since there are two free unused platforms at Moorgate it might prove too difficult to put into effect. It should be remembered that Farringdon will be an important station on Crossrail with connections to Heathrow and London City airports. Moorgate on the other hand will not be an official station on Crossrail but will have direct underground tunnel connections to the station and platforms at Liverpool Street which is the official stop on the Crossrail line. Thus the resulting service would be from Gatwick northwards to Central London and on  to Luton airport returning via Stevenage to Kings Cross or Moorgate, and vice versa.

Another possibility exists, but might be unnecessary, which is to provide through regional commuter services from Milton Keynes either via Luton to St. Pancras, or via Luton, the airport and Stevenage to Kings Cross/Moorgate. No option should be ignored.


Whichever option is chosen is of importance because the passenger traffic flows to the airport can increase or not because of the greater accessibility of the airport. Many times it is not a question of theoretical journey times which determine a traffic flow but the convenience offered. A five or ten minute difference might well be ignored if the connection can be made more comfortably with only one change instead of two or three. Lumping cases on to and off trains is an important factor to take into consideration.

Roads:
 We propose a better connection to the M1 motorway which does not interfere with the local Luton traffic as well as a good connection to the A1(M) trunk road to provide alternative routes both north and south, as well as to those parts of the country which interest the users without blocking up the system.

This is a subject I have not mentioned in detail. I consider that the provision of public transport is of paramount importance. The more the public transport system is used the more it is considered as important. When it is considered important the result will be a lessening of demand for road transport. Here we come back to the ideas of connectivity and convenience. Why leave your car in a long-term car park for two weeks if you do have a comfortable, convenient and well connected public transport system. If we can take transport off the roads then all the better for those who really need it.

The effect on Stansted:
Tim Leunig is of the opinion that Stansted airport would have to close with any expansion of Luton. This probably would not be the case immediately as all things are transitory. However, it must be considered as a possibility, eventually. This would mean compensation for the owners of Stansted. It should be emphasised here that in November 2012 the present owners BAA must still sell the airport. Obviously the new owners are very much interested in knowing if there are possibilities of expansion or not - i.e. will they have paid over the odds in the long term?

The traffic patterns with a two runway airport at Luton need not affect Stansted too much. Quite a different question is the working of a four runway airport at Luton. Then without doubt the restrictions on air movements at Stansted would be notable. Its status might well be reduced to that of Southend at the moment - this airport has to fit in its traffic flows with London City and Stansted, so its capacity is reduced. The same would happen at Stansted where, at most, it could have some regular flights, but most likely would have to find another role e.g. as a maintenance depot (as Cardiff is at present for BA).
 


Conclusion:
This blogger considers that the expansion of Luton airport is most certainly essential together with the expansion of Heathrow to three runways and Gatwick to two.
As we noted, 5th July 2010, on the Conservative - Liberal Democrat coalition government coming to power the prohibition of expansion at South East England airports specifically mentioned Heathrow, Gatwick and Stansted. It did not mention Luton which resulted in the blog of that date. The question is, is that the get out clause for the government? This blogger considers it so. It is an area with few Conservative and no Lib-Dems candidates worrying about their seats. The job prospects produced by expansion for the local populace can only be seen as positive. The alternatives to doing nothing are a decline in the fortunes of the country, therefore, expansion has to take place - somewhere or somewheres.

Why not expand this airport north of London to serve the rest of the country as well ,and so avoid gridlock in the capital, meaning that any out-of-London passengers would not have to transit the capital. The question of funnelling passengers( and other traffic) through the capital´s transport system is something which has never been mentioned but needs to be.That, however, is another question at which we will look eventually.