Showing posts with label air pollution. Show all posts
Showing posts with label air pollution. Show all posts

01 February 2015

Heathrow and/or Gatwick - Let´s focus more

After having written a piece called "Heathrow´s 3rd runway - how to focus" in February 2012, it is about time to bring things up to date.

.....  Of course, you can look at these things from a very narrow perspective, or if you prefer you can see a bigger picture which is more illuminating.

The prestigious CAPA Centre for Aviation brings out analysises on a regular basis about different aspects of the airline industry.
In the last year alone, on 19th May 2014 it produced a study on the progress of the arguments in favour of one or another option for new runways titled, "London’s Heathrow and Gatwick airports commence the next phase of Davies Commission runway battle."
On 10th September 2014 this was followed up by another article titled,"Thames Estuary Airport dropped: a milestone reached in the eternal debate on UK airport capacity."

Some specialised periodicals have been publishing articles about the runway expansion debate. Here is a selection from September 2014 to January 2015. Each headline itself  tells a distinct story though each has its own link so that it can be read in its entirety. 


Buying Business Travel:
29th August 2014,         "Heathrow urges Boris to support bid for expansion"
1st September 2014,     "Boris attacks ‘barbaric’ Heathrow third runway plan"
2nd September 2014     " 'Boris Island' airport plan rejected"
9th September 2014,     "Majority of MPs back Heathrow expansion"
19th September 2014,   "Gatwick airport gains public support for expansion"
2nd October 2014,        "Birmingham airport backs Gatwick bid for second runway"
8th October 2014,         "Business leaders criticise Lib Dems for airport expansion stance" 
3rd November 2014,      "Willie Walsh: ‘No business case’ for second runway at Gatwick"
7th November 2014,      "Heathrow warns of losing top airport status" 
11th November 2014,    "Heathrow and Gatwick plans to cost billions more than forecast"
11th November 2014,    "Public back airport expansion in south east, ABTA study finds"
20th November 2014,    "Gatwick warns of 'capacity crunch' after record results" 
1st December 2014,     "Heathrow to extend property compensation scheme"
1st December 2014,     "Regional airport chiefs back Heathrow expansion"
3rd December 2014,     "Heathrow CEO ‘sorry’ over runway promise"
20th January 2015,       "County council opposes second runway at Gatwick"

travelweekly
1st September 2014,     "Address UK air capacity 'ticking time bomb', says CBI"
2nd September 2014,    " Public urged to speak out on airport expansion" 
22nd September 2014"Small businesses 'back expansion of Gatwick' "
30th September 2014,   "Osborne hints at speedy decision on airport capacity"
3rd October 2014,         "Gatwick pushes case for second runway at regional roadshows"
27th October2014,        "Branson accuses politicians of being 'cowardly' over Heathrow"
28th October 2014,       "British business urges backing for Heathrow expansion"
3rd November 2014,      "Potential Conservative party split emerges over Heathrow expansion"
3rd November 2014,      "Environment as important as economic impact of airport expansion, finds YouGov poll"
12th January 2015,       "Heathrow and Gatwick claim record performance in 2014"
19th January 2015,       "Gatwick unveils 'low-risk' two-runway plan"
29th January 2015,       "Abta calls for new runways at both Gatwick and Heathrow"

Flight Global.
21st September 2014,   "Gatwick eyes point-to-point routes for long-haul growth" 

Airwise/Reuters
21st January 2015,        "UK Needs Quick Decision On New London Runway"


This blogger thinks it unnecessary to comment on each article. Readers can absorb what is written and come to their own conclusions. Sufficient it is to say that each person, grouping, poltical party or administrative area is pushing its own agenda for its own reasons. They do not necessarily reflect this blogger´s.
The most significant point to note is that mentioned on 12th January about an increase in traffic at both Heathrow (to 73.4 million passengers - up 1.4%) and Gatwick (to 38 million passengers - up 7.6% ) in 2014 compared to 2013. The problem about the need for expansion of capacity will not go away.



Let us look at some truths....

1-There is a big demand for more runway capacity in the South East of England.
2-More runway movements mean more flights into one, two or more, or all the airports in the South East region. Denying that is ignoring the evident. There is a demand and it has to be satisfied one way or another.
3-There are arguments both in favor and against the expansion of one airport or another.
4-The preferences for increasing the capacity of one airport or another is, many times, the ability of the politicians to convince people to their way of thinking. 
5-More runway capacity means more flights, which mean more point-to-point or transfer passengers, which mean more economic benefit for the regions, the airports and the principal players at the airports. The more flights, the more likely the increase in connections to various destinations.
6-the country as a whole benefits, not just the South East region.
7-If no new runways are to be built at Heathrow or Gatwick then a new site has to be chosen. This means Luton or Stansted. Luton is the better situated airport but presents difficulties in construction - but nothing like an Estuary airport. Stansted would be the prefered solution for many in government or the Civil Service - as it has been since the early 1970s. However, with respect to the rest of the country it is out in the boondocks, difficult to reach and needing an excessive investment in infrastructure. Most of this infrastructure already exists at/to Luton.
8-Any such commitment to a "new site" implies a commitment to a new 4 runway airport - something which is not necessary with the expansion of both Heathrow and Gatwick.  
9-The choice of Luton as a new 4 runway airport could well mean the reduction, or even closure of Stansted. The choice of Stansted would well mean the closure of Southend and possibily Luton. Both choices mean a reduction in alternatives.

Let us look at some of the non-truths....

1- Limiting the number of flights at Heathrow or Gatwick airports does not mean a total reduction in flights in a region.
2-Can the demand for more flights be satisfied by replacing Heathrow flights with Stansted ones, or Gatwick flights with Luton ones? This is just wishful thinking.
3-Many people like to think that the unused capacity at regional airports can be used to satisfy demand.
In certain instances this might well be the case. However, it is not true in most cases. I do not hide behind the decision of British Airways(BA) to pull out of UK regional airports to justify the fact that there is no demand into and from the regions to warrant onward flows to long distance destinations. I honestly think that there could be a demand but BA is not interested. That then becomes a self serving argument - no in-put therefore, no out-put,  no in-connecting services therefore no outgoing services to North America or Asia --- even if the demand had been shown to exist  before.
4)- Any meaningful descision can be put off/delayed  to another Parliament.That is just sweeping the problem under the mat.
5)- Luton cannot be developed as a 4 runway airport. This is false since there is sufficient space between Luton and Harpenden to fit in 4 parallel independent runways which would not affect either town with overflying.The ground itself needs leveling but the work itself is far less than any envisaged on the construction of an Estuary airport.



From this point we can develop the argument to include many differing opinions.

This blogger has expounded on this issue before as stated so it is not necessary to repeat all the same arguments in detail.



Considering one aspect, extending Heathrow´s runways westwards towards the M25 can help in the issue of noise reduction.The northern runway can be extended 900 meters towards the M25 while the southern runway can be extended 1300 meters.
This means that noise pollution over West london can be mitigated to some extent since the aircraft can be landed that much further down each runway so eleviating the noise problem over extensive areas of West London.
Add to that the possibility of increasing the angle of descent for the landing aircraft then the height at which the aircraft fly into Heathrow (or Gatwick) can be increased to a fair tranch over the built up areas - the higher the approach the lower the noise. 

Extending the runways further west over the M25 motorway and even over the reservoirs west of the motorway is a possiblity but would be ridiculously expensive and unnecessary.

If measures can be taken to extend the runways westwards towards the M25 thus enabling aircraft to land further along each runway then the noise issue can be mitigated.
However, combine that with the improvement of aircraft and engine design (which has been evident over the past decades) then there can be a real reduction in noise pollution.
If then you go the one step further to legislate that ALL aircraft entering or leaving from Heathrow (or Gatwick for that matter) have maximum permitted noise levels, then you can ensure that the reduction in noise levels over West London (or Crawley in the case of Gatwick) is real and substantial.

The fuel pollution, i.e. CO2 or other toxic emissions, is limited by improvement in airline and engine technology. Over the years the emissions have been reduced to much lower levels so as to be more acceptable. A Boeing 787 does not have the same emission levels as a B767 or B757. An Airbus A380 or A350 does not have the same level of emissions as a B747-400 or an A340. These new aircraft provide a lower level of noise and pollution not seen before.
Quite frankly, it is really ridiculous to say that the effects of aircraft movements over any given area are the same in 2015 as in 1985 or will be in 2030. That is an ostrich approach.

This blogger believes that a third runway at Heathrow and a second runway at Gatwick can both be built to solve the shortage of runways in the South East of England. They both would mean years of investment but not from public money.

They should be permitted on the basis of a reduction in aircraft noise, measurable, verifiable and, if necessary, sanctionable for excesses. The same criteria would apply for toxic emissions. The fact that the aircraft landing and taking off from Heathrow and Gatwick had to conform to a limit of 55-57 decibels, or whatever were decided, together with engine emissions of xxxCO2, could make the constructuion of an extra runway at each airport viable.

Applying these reductions for all operations over two years gives time for the airlines to adapt (previously I said a generation but now I reduce the time limit because the roll out of the new aircraft will be faster than originally thought  -  so in effect since the initial idea was proposed until its implication a generation will almost have past). Maybe the British airlines should lead the way with European, American, Middle Eastern and Far Eastern airlines following. Then the "poor neighbours" could follow.

These rules applied to Heathrow and Gatwick would mean a big change in flying patterns. Applying them later to Luton and Stansted would help redistribute the traffic into/out of London.

Other considerations:
A third runway at Heathrow does mean a new terminal. This would be situated over the road and rail tunnel out from the terminals 2 and 3. It might even be called Terminal 1(previously I called it Terminal 6) to replace the previous terminal which is due to be taken down. Then it would have a direct connection to the Heathrow Express services and the Crossrail services (as they will then be) to the rest of the airport and into central London.

Having a terminal north of the Bath Road does not mean there would be any necessity for aircraft to cross over the northern runway to gain access to any terminal. The best solution would be for all flights out of the (new) terminal one to connect to the islands and near connections. By this I mean Ireland and all the islands of Great Britain, plus others such as The Faroes, Iceland, Malta and even the Benelux countries, without excluding others. I mean all flights so that no airline or alliance is affected negatively.
That way BA (oneworld), Brussels Airlines(Star Alliance) and KLM(Skyteam) would be equally affected.
This is what was suggested in the previous article in February 2012.





News which is both good and worrying:
These headlines link to articles about all of London´s main airports and the increase in passengers year on year at each. Such is the reflection of an improving economy.
"Stansted welcomes over two million more passengers in 2014"  (Air Transport News 12-1-15)
"Record passenger numbers for London Luton Airport in 2014" (Air Transport News 8-1-15)
"Record year at London City Airport a sign of confidence" (Air Transport News 8-1-15)
 "Heathrow traffic and business commentary December 2014" (Air Transport News 12-1-15)

London Gatwick Airport: Facts and Stats



All well and good, but the worrying part is the delay in deciding on runway expansion in the south-east. This information surely illustrates the need to take decisions now and not after the next election. We are a victim of our own success.

We do not want any fudging. Let the government lay down (strict) conditions for runway building, then let both Heathrow and Gatwick get on with the job of building the extra runways at both airports with their own funding.
Not one but two runways are going to be needed by mid century. Cannot we anticipate demand for once?


Gatwick´s second runway option.



The analysis provided by the airline site anna.aero on 21st January 2015, provides some interesting comparative information about both Heathrow and Gatwick.

Let me quote the complete concluding paragraph....
"....It’s pretty obvious to anyone that both airports are clearly running close to maximum capacity and both are highly vulnerable to disruption (such as sudden bad weather or an operational emergency). An additional runway at both airports would considerably help with reliability as well as creating opportunities for significant traffic growth, and benefits to the UK economy of somewhere around a whopping £300 billion ($500 billion). To get this figure we combined the Airport Commission’s estimates of the economic benefit of each runway – a total exceeding £340 billion – and ‘slightly’ discounted the total to account for overlaps – in truth nobody knows what the actual figures are, but it is safe to say the benefits would be an absurdly huge boost to the UK economy and competitiveness, were any political party able to explain it to the electorate."

This blogger supports this view wholeheartedly.

Now on 3rd february 2015 the last chance to provide evidence for consultation presents itself..
To join the debate and tell the Airports Commission your feelings visit:
www. smartsurvey.co.uk/s/134578HXHDU.

12 March 2013

High Speed Rail Lines - how to focus (other lines) 3/3






















This is the third in a series of 3 articles about High Speed rail in the UK.

After writing about the routes to the Midlands, the North East and North West on their way to Scotland there is one grand high speed route that should be mentioned - the Great Western Main Line (GWML) to South Wales and the South West.

I will exclude from this review the third rail DC routes to the South and South East together with the routes to East Anglia(Kings Lynn and Norwich) as all these routes are dominated by commuter traffic so their problematic is different. Norwich might well be the exception. In any case most of these routes will be connected both north and south of London in the Thameslink programme.

Future train service patterns and operators will be determined by the DfT following a re-franchising process which is currently planned to take place in 2013. However, the intention is to link many new destinations north and south of London:


GWML: This famous line is the old GWR, or "God's Wonderful Railway", built/engineered by Isambard Kingdom Brunel. Since is was originally built to a wider running gauge than the other railways at the time it provides more space for improvement works. Also it is straighter than is the case in many of the other original lines facilitating the elevation of line speeds. It is ideal for upgrading and upgrading is what it is receiving.

The GWML from Paddington to Bristol and onwards

With the Crossrail project running from Paddington to Maidenhead this section is already being electrified and improved. Obviously the logical next step is to extend the programme to Reading to include all the local services from there into Paddington but this has not been decided as yet. Electrification of the line to Reading and on to Bristol, together with the electrification to Cardiff and Swansea has been agreed upon. Extensions from Reading to Newbury and from Didcot to Oxford are also envisaged. These are important with respect to other proposed projects. The timetables as published by Network Rail are for completion to Bristol, Newbury and Oxford in 2016, with Cardiff being completed in 2017. No date is given for Swansea - probably 2018/19.



  However much the politicians try to convince us, we know that high speed rail travel should not be limited to radial routes from London. Passengers wish to travel from different points to others without necessarily passing through London.  As I have stated previously "Rail customers want to be able to  travel safely, in comfort and at reasonable prices between
the most densely populated parts of the country", yes, but this does not mean necessarily passing through London.

Other ideas have been floated and I have compounded them into one such project which I have called the "Southern High Speed Line" (SHSL).

Firstly, there were proposals to connect Reading with Heathrow airport. This was an idea based on the assumption (a) replacing the present Railair coach service run at 20 minute intervals so taking polluting buses off the roads, and (b) at some time in the future permitting GWML trains from Bristol and South Wales to run into Terminal 5. This was not a well thought out idea and was only a bit solution in any case. This I looked at on 6th October 2011.
 http://trans-trax.blogspot.com.es/2011/10/reading-heathrow-rail-connection.html

Secondly, there was a proposal to link Heathrow and Gatwick airports, provisionally named "Heathwick". The idea was to connect the two airports with high speed trains so that they could be used interdependently. It would also replace the National Express coaches from Heathrow to/from Gatwick (100 per day).This was resoundingly and rotundly rejected by the parties affected and rightly so. I looked at this case on 11th October 2011. 
 http://trans-trax.blogspot.com.es/2011/10/heathrow-gatwick-rail-link.html

 Thirdly: add these two projects together and you can see that it is a relatively short extension from Gatwick to Ashford and the Channel Tunnel. That way you can achieve direct rail services to Continental Europe without any difficulty, to Paris, to Brussels and onwards. Is this not what the rail lobby wishes? You obtain direct rail services from the two principal London airports on some of the busiest  short-haul air routes in Europe, to Paris, to Brussels, to Amsterdam and to Cologne/Bonn. Would these not end up reducing air traffic at the two airports and by extension free up landing/take off slots for other long-haul flights?All this and without transitting through London itself!!

Fourthly; from there it is a small step to start thinking about the very same European rail services starting from Reading. If they start from Reading , why can they not start from Birmingham or Bristol? We know that these possibilities are more complicated logistically for passengers but not so difficult for freight traffic. So let us think about freight traffic going from the Midlands and the West of England directly to Continental Europe without passing through London - by avoiding London it means we can avoid a probable bottleneck.

Fifthly; If you take the arguments from there and start to think about what traffic is through traffic, that which does not want or need to stop in England on its way to Europe, then you start to think about the traffic to/from Ireland to/from Continental Europe - both passenger, but principally freight. The non-stop passenger, car, freight rail services to/from Ashford to Calais have reduced substantially the sea ferry traffic. Since this is the case then would it not be the same for traffic to/from Ireland? Obviously there is no direct link to Ireland from Britain as yet except by ferry, but, however, would it not be quicker, more comfortable, and cheaper to provide through European services (by EuroTunnel) from Ireland to Continental Europe? Obviously, since there is no tunnel from Rosslare to Fishguard (the shortest route to Calais) the train services would have to start there, in Fishguard, meaning an extension of the ferryport to accomodate the most likely extension of the services. The train link would then be non-stop from Fishguard to Calais along the GWML, the Reading-Heathrow extension, the Heathrow-Gatwick extension and on to Ashford and the Chunnel.

Would not lorry(or car) drivers find that paying for the through route by train from Fishguard to Calais better than driving that distance, considering the time, the stress and the cost? Would it not be a double winner for Britain if such through traffic were taxed on the roads so as to make the cost of travelling by road or by rail the same? Would this not be the carrot to free up the roads and also free us  from the pollution if the traffic were transferred on to rail?

All, these ideas put together  bring us to the conclusion about a a dedicated line from Fishguard to Ashford
Thus my two blogs on 24th February 2010 ...
 http://trans-trax.blogspot.com.es/2010/02/fast-trax-2-case-for-southern-high.html
..... and  15th May 2012
http://trans-trax.blogspot.com.es/2012/03/who-wants-irish.html


If such a service could be provided, especially for freight traffic then could not the same be offered for freight traffic originating in Great Britain? Of course it could.
A site next to the GWML railway, and the motorways outside Bristol would be ideal to service freight(and car/passenger traffic?) from South Wales, the West, the South West and south Midlands non-stop to Continental Europe.
From a site near Birmingham - again next to the rail lines, the airport and the motorways - would be ideal, especially for freight traffic to run down to Reading and along the SHSL to Ashford and the Chunnel.
Both projects would make a significant effect on pollution and on traffic volume.





Transpennine Routes: The electrification of the Liverpool Lime Street to Manchester Victoria line (via Chat Moss) will reduce the journey time between those two cities. Agreement has been reached to extend this electrification from Manchester to Leeds and on to York. That way the through services between Liverpool and Newcastle can run under the wires for its whole length. Unfortunately, the lines from Leeds to Hull (and Scarborough) are not due for electrification so these services will have to be diesel  wasting the benefits of electrification for most of its length. On the other hand trains could begin at Leeds but this is an inconvenience for passengers. Thus the line from Leeds to Hull (and possibly Scarborough) is an obvious candidate for electrification at the earliest opportunity.

The third service from Liverpool runs from Lime Street through Warrington Central and Manchester Piccadilly to Sheffield, Doncaster on to Grimsby and Cleethorpes. This line is not electrified so diesels would be used. The logic for electrification is obvious since line speeds would increase substantially but the economic case has to be looked at which might torpedo any such project.

Problems might well arise at the Liverpool end. The line from Wigan and St.Helens into Lime Street is to be electrified. That could well mean that intercity services from Liverpool to Glasgow and Edinburgh would restart making present constraints in the station even worse. If the demand for Transpennine services increases then the problem could become acute. Then a strong case would be made to reopen Liverpool Central station (at ground level).

This is possible since the tunnel into Liverpool Central still exists and is partly used by the Merseyrail Electrics (the Mersey Tube). However, the tunnels were built for four tracks so still could be used for mainline services into a reopened mainline station at ground level. At the terminus the site is now occupied by a supermarket. This could be solved by rebuilding the supermarket on the top of the mainline station.

This way overcrowding at Liverpool Lime Street station can be alleviated. The old CLC services along the line from Manchester Central, Warrington Central into Liverpool Central could be restored thus cutting ten minutes off the present timetable which is the penalty for running into Liverpool Lime Street. Obviously at the Manchester end the old Manchester Central station is not available so services would run to and through Manchester Piccadilly as at present, without any time penalty.

Other lines:
The cross country traffic is quite substantial whether it be passenger or freight. Therefore,the main lines connecting these points are essential.
Bristol to East Midlands and Southampton to Birmingham come to mind immediately.
Phase 2 of HS2 from Birmingham to Nottingham (and onwards) is of paramount importance for traffic from Birmingham to Bristol and onwards. Birmingham is and will be an important interchange for passenger traffic which does not want or need to transit through London. Certain line straightening from Bristol to Birmingham would be necessary to increase the line speeds so as to make the line more attractive. Add that to HS2  to Nottingham and then there is a strong route all the way from Bristol and further afield to Leeds.

The Southampton to Birmingham line has already been targeted for freight. The first part is the section from Southampton to Basingstoke and Reading. This is three DC rail electrified.
the second part is from Reading to Didcot, Oxford and Aynho(just south of Banbury and Kings Sutton) and on to Birmingham. The section from Reading to Oxford is to be electrified with AC overhead wires. The section from Aynho(or near Banbury) is to be part of HS2 from London to Birmingham. That means that all that is needed is to join the section from Oxford to Aynho - which is about 27 kms. - with overhead  AC wires. This would make the connection from the South´s main port to the Heart of England and onward to East Midlands or the WCML at fast speeds a reality.

The Felixstowe to Nuneaton line has also been upgraded. This, however, is mainly thought of as a way to facilitate freight traffic from the East Coast port to the ECML and WCML. The loading gauge has been enlarged so that the larger containers can transit the lines so facilitating greater use of rail freight and so fewer lorries on the roads. It is not really thought for passenger traffic as the line has not been straightened and so the line speeds are still reduced.

Scotland : Obviously not all the trunk routes have been mentioned. There are three principal routes between Glasgow and Edinburgh. Which of these will be dedicated to high speed traffic as against serving local traffic is something the Scots know more about than this blogger so they will decide. They are already talking about a fast route.

The communications northwards are still anchored in the Victorian era. In such a large geographical area it is essential to use rail to vertebrate the country. The main cities to be offered better communication are Inverness and Aberdeen from both Glasgow and Edinburgh.   That way other important cities get connected like Dundee, Perth and Stirling.

The Borders have not been forgotten and could well achieve better communications with this blogger´s ideas about high speed lines from Carlisle to Glasgow and Newcastle airport to Edinburgh. The main lines were explained in the first blog of this series of three. (High Speed Rail Lines - how to focus (The Scottish Connection) 1/3 (31st January 2013)

At the moment the traffic forecasts probably would not make these high speed lines through the Border region as economical as wished for.That does not mean they should not be put into effect. For that reason regional services would be ideal. With stops along the line (off the main line) passing points would be provided for. These would be for slower regional stopping trains and freight trains. That way non-stop fast trains would not be impeded. Obviously not everything has to be done at once but should be included in the plans for long term solutions.


Conclusions:
Fast rail lines fulfill a desire and a need.  New and improved lines encourage people to travel by rail as has been proven in the last decade with the upgrade of the WCML. However, speed for speed´s sake is not justifiable. 400 kph. maximum running consumes enormous amounts of energy and makes turning circles so great that the lines cannot avoid any obstacle. This would mean slashing through the landscape and taking everything in its way before it. A lower maximum speed - but still fast - such as 320 kph. is more than enough for this small island.

Is there a need for new lines? HS1 from the Channel tunnel to St.Pancras showed that there is a need. The previous route to Waterloo was unsatisfactory as HSR trains had to mix with commuter traffic.

The question is if more HSR lines are needed. The answer to that question is mixed. If the question is line capacity alleviation then a new line has to be compared to increasing the number of tracks on existing lines. Doubling a twin track line to four track does not double capacity - it is more than that. Trains that run on the dedicated "fast" or "slow" tracks run more in accordance to the preceding and following trains so the distance between trains can be less - thus more run per hour.

When increasing the number of tracks these do not necessarily have to right next to the "old" track. The new tracks can be next to or near the "old" track, but the construction would take advantage of the line(or as I have said before the corridor) of the "old" track to straighten the "new". In that way higher line speeds can be provided for.

Are new lines necessary? As the command document on phase 2 of HS2 states HS2 is based on assumptions, such as having a dedicated separate line from terminus to terminus, which makes the idea inflexible, ridiculously expensive and obviously does not consider any extensions further north.This blogger considers that new lines should be built where essential but not as an end in themselves.

The greatest needs are for new lines at Shap in Cumbria, from Gretna Green to Glasgow and from Newcastle to Edinburgh.  At Shap the fast new section of the WCML would run through the mountains from Kendal to Shap thus cutting out the roundabout route. The line from Gretna would run near to the present WCML but seperate from it almost all of its length. The line from Newcastle would have a totally different route from the present ECML to make it much shorter as well as straighter. Nobody should balk at such suggestions as we know we are talking about infrastructure for the next 100 years (or more).

The rest of new construction would be relatively short sections to improve the total journey time. The longest sections would be from Derby to Stoke, and from Ayno to Birmingham airport(if my suggestions about HS2 are accepted). Phase two from East Midlands to Leeds would have, in my suggestions, short sections coupled with upgrades. Other new sections of line are marked on the respective maps but are not of significant length.

Will these solutions be expensive? Yes, but necessary. Will they be cheaper than the HS2 proposals? I do not doubt most of my suggestions would come out cheaper when all costs are taken into account. However, costs should be looked at in two distinct ways. The capital costs are an investment in improving infrastructure to satisfy the needs of the travelling public so would need to be accepted per se. The running costs of the improved services, when they are implemented, have to be controlled strictly so that the rail service for the general public can be offered at reasonable prices without necessarily losing money.  It is very noteworthy that SNCF, the State French Railways announced on 20 February 2013 the setting up of a cut price HSR service called OUIGO . SNCF unveils cheap high-speed service (ref: Rail.co website). This will provide, initially, a cheap TGV service from Paris to Lyon, Montpellier and Marseille.

The relevant question is why? Obviously, if all the capital costs of new projects  are included into the cost of a new line then it will never maker a profit. The sales price has to be such that the clientele use the service and there can be a profitable return, the public are not scared away by the ticket prices. SNCF obviously, want to fill up the TGV lines to capacity.  


However, remember, the capital costs can be allayed by subsidies from the European Union to a great extent so reducing the cost to the local market. The Trans-European Transport Network Executive Agency was set up by the European Commission to help fund trans-European transport projects,so some or all of these projects qualify.

As a last point we should look again at the way benefits can accrue from High Speed rail lines as pointed out by the World bank and published here in Rail.co 22 Jan. 2013

N.B: Take note of these articles also....

"Speed not enough to entice people onto HS2"
http://buyingbusinesstravel.com/news/0416138-speed-not-enough-entice-people-hs2

"HS2 In Favour and Against" 

 http://trans-trax.blogspot.com.es/2011/07/hs2-in-favour-and-against.html

 

22 February 2013

High Speed Rail Lines - how to focus (HS2 and to Leeds & Manchester) 2/3




This is the second in a series of 3 articles about High Speed rail in the UK.

The publication of the government´s policy document in January 2012 entitled  "Review of the Government´s Strategy for a National High Speed Rail Network"  laid out ideas for fast rail transport. On 28th January 2013 under the title "HS2 phase two initial preferred route plan and profile maps"the specific ideas for the extension of HS2 from Birmingham to Manchester and Leeds were published. This document looks at both phase one and phase two. Also published by the DfT on that date was the accompanying document to justify the choices made titled  "High Speed Rail:  Investing in Britain’s Future –Phase Two: The route to Leeds, Manchester and beyond"



This blogger works under some assumptions which have to be repeated.
(a)- we wish to have faster trains to the most populated parts of the United Kingdom so that rail customers can travel safely, in comfort and at reasonable prices to the most densely populated parts of the country;
(b)- The country is (relatively) small and densely populated so any new lines (long or short) have to be carefully thought out so as to make as small an impact as possible on (in this order) homes, other residential areas, other important property, industry and workplaces, recreational areas, and the unspoilt countryside in general;
(c)- Existing transport infrastructures and their corridors should be used as much as possible to reduce the impact of new construction;
(d)- New transport projects should work to connect existing transport nodes and promote the use of public transport so as to reduce the dependency on private car transport;
(e)- Any new transport construction should be developed so as to make the most efficient use of energy, and reduce the toxic and noise pollution from the most offending vehicles,thus leading to their reduction in use and the liberation of space on public ways.
(f)-The existing rail corridors should be recognised as such, and therefore, accepted as being the main arteries of the country. They should all consist of four tracks of rail (next to or near each other) so that there can be a separation of fast rail from regional, local and freight services but interconnecting in case of need (for emergencies or maintenance). 

What this blogger rejects are...
(i)- speed for speed´s sake
(ii)- projects which demand great quantities of resources over and above what is necessary to provide a good, reliable, quick rail service
(iii)- projects which marginalise a large proportion of the population unnecessarily
(iv)- projects which promote private car transport thereby defeating the objective of clean, environmentally friendly  transport
(v)- projects which carve up and scar the countryside where alternatives exist 
(vi)- projects which become self serving to the interests of political, financial, technical and legal groups to the detriment of the public good.
(vii)- nimbyism for nimbyism´s sake.


 --------------------------------------------------------------------------------------------

In the previous blog I looked at the two main north-south trunk rail lines connecting London with the north west and Glasgow  via the WCML on  one side, while the ECML connects London with Leeds, York, the North East and Edinburgh on the other side of the Pennines.

With the High Speed line (HS2) from London to Birmingham approved and progressing (at least in the planners´offices), I think it is time to look again at the problems and try to sort out solutions for this small island of ours. HS2 has as its basic idea to link London with Birmingham with the eventual proposal to link Birmingham with Manchester and Leeds in two separate branches. This article tries to look at the proposals in a critical way.

It is recognised that there is a shortage of line capacity on the West Coast main Line (WCML) which will become acute in the next ten years. This is, mostly, on the section from Rugby to London.The problem is particularly bad with local stopping services and regional services. Commuters suffer from overcrowded trains, especially in the rush hours and there are no paths for more trains. The intercity trains also have no more paths available. For that reason trains are being extended from 9 to 11 carriages. Some stations, think of the Trent Valley stops, are not served as well as they should be. They, thus, reduce the number of passengers and  the possible revenue for the rail companies while increase the road traffic to satisfy the demand.
This is the principal reason for the desire to build HS2 from London to Birmingham.

The time lag mentioned in the documents published in January 2012 suggests the new HS2 to the West Midlands will be operational in 2022 while the extensions to Manchester and Leeds will take another eleven years, up to 2033!!! That is 20 years from now to see and be able to use a mode of transport which only partially solves the problem. A good straightforward explanation of the steps needed in getting HS2 started is given in an article in "The Rail Engineer" (11 February 2013) titled "High Speed Interest"

This blogger thought it best to split HS2 into three parts and so deal with each separately.

* * * * * * * * * * * * * * * * * * * * *

-The white line indicates the route decided for the rail line from London to Birmingham and the proposals of HS2 Ltd.to the government from Birmingham to Manchester and Leeds.
-The black line indicates the present classic line in the respective corridors.
-The green line indicates the classic line widened and upgraded to four tracks.
-The purple line indicates a new two track fast section of line to complement the classic line.
-The dark blue sections are parts of the new two track fast section in a tunnel.
-The lighter blue sections are those which combine short new sections combined with upgraded classic sections of line.


* * * * * * * * * * * * * * * * * * * * * *


1) - HS2 London to Birmingham (The Chiltern Corridor):
 

The newly established (white) route leaves Euston in a new tunnel to Old Oak Common then continues along the present Chiltern Line /LUL corridor from North Acton to West Ruislip (almost at the M25). From there it steers northwest, south of Amersham, south of Aylesbury, north of Leamington Spa while south of Coventry to an out-of-town stop near the National Exhibition Centre at Birmingham. One section then branches off to enter into Birmingham City Centre via Water Orton to a new city centre station at Curzon Street between New Street and Moor Street stations. The other sector branches off northwards to join the WCML between Lichfield and Rugeley.

The route that this blogger proposes runs from Paddington through Old Oak Common, along the present Chiltern line (upgraded to four track) to east of Beaconsfield, then along a new two track fast stretch, including a tunnel under Hazelmere(10.6 kms.) to finally rejoin the Chiltern line west of Princes Risborough. The route then continues along the Chiltern line (upgraded to four track) to Aynho (just south of King´s Sutton). from there the route is new up to the WCML just east of Birmingham International Airport. from there the trains can run on the present (upgraded) WCML into Birmingham New Street or northwards to join the WCML just west of Lichfield Trent Valley station.

According to my calculations the HS2 route from Old Oak Common to Birmingham Curzon Street is 166.6 kms. while using a combination of Chiltern line (Classic route- CR) together with new sections the route would work out from Old Oak Common to Birmingham New Street to be 166.0kms. The saving in distance would be 600 meters, not a lot over such a distance but something.

The real savings would be others. The HS2 line is all new, will be hidden as much as possible in tunnels and cuttings but is tremendously obtrusive in (as yet) unspoilt areas. This blogger´s proposal is less obtrusive since it uses an already existing corridor for more than half its length. For the other sections it can still use tunnels and cuttings to reduce its environmental impact. The HS2 proposal in effect demands the construction of half a new station at Euston, a new station at Birmingham Curzon Street and a completely new station, out in the boondocks on the wrong side of the National Exhibition Centre outside Birmingham requiring a twenty minute walk to the airport.

This means a Birmingham Parkway station where people can access it by car thus providing the excuse to use a car and not public transport. This negates the purpose of public transport. Public transport, as usual, will be poor and far between, basically serving the poor, infirm, aged and students - only operating during the busy times of day. Who would want to be stuck out at such a station waiting for a bus at 10.30 pm.? The Euston station station means an unnecessary tunnel to it from Old Oak Common coupled with lots of housing to be demolished, just so developers can erect office blocks over the station - something they forgot to do with the rebuilt Euston of the 1960s. With Crossrail subtracting services from the station Paddington can provide platform capacity for HS2.

The station problems in Birmingham are unique. New Street, Moor Street and Snow Hill are all important termini (or city centre stations). the possibilities of rebuilding and extensions are limited so a new station at Curzon Street might well be necessary. It all depends if Curzon Street is to be a terminus station or if the HS trains will continue through Birmingham City centre to population centres beyond (this is what the French do). However, what must be ensured are the connections between them - albeit through underground walkways, but protected from the weather in any case.




2) - HS2 Birmingham to Manchester/Preston (The WCML corridor):


The connection from Birmingham northwards to Manchester and Wigan is clearly more problematic.   It is just as well that it it is only a recommendation and not definitive as yet since it is totally unjustifiable.

From Lichfield the HS2 has a connection to the WCML from where it also continues on a roughly parallel route north of the WCML to Crewe for a distance of 61 kms.



However, if we ignore this section all trains could run on an already upgraded four track railway all the way from Lichfield to Crewe - the WCML. The present track gives a running potential higher than the legally permitted speed. The following improvements would make it much faster-
Incorporating short sections of new or improved line from......
(a) Colwich to Stafford East of 6.86kms.
(b) the Stafford underpass (for through trains to avoid the curves) of 4kms.
(c) a short stretch of line to be straightened at Norton´s Bridge 3.6kms.
(d) a short stretch of line to be straightened at Baldwin´s Gate 4.35 kms.
all these to be two tracks supplementing the present four track system.
This means a track improvement of 18.81kms. between Lichfield and Crewe

The difference between the two proposals makes for 42.19 kms of construction which are not necessary.


On page 41 of the command document for phase 2  is shown the proposed underpass for Crewe. This is necessary for all trains north-south as well as south-Manchester ones which do not stop at Crewe. HS2 Ltd´s proposal means the line to Manchester runs there on new track after leaving the town to the north.





I disagree with that proposal. I suggest the line branches off to Manchester in the underpass emerging outside the town to join the present Sandbach - Holmes Chapel WCML line outside Crewe after passing under the town and branching off northeastwards under the town. The main WCML can continue northwards and emerge outside the town on the outskirts at Leighton. It then continues northwards on the present WCML.

On this route the line is mostly fast two track to Warrington but this can be remedied to four track.without any great problems. The trains to Liverpool would branch off to Runcorn at Weaver Junction as at present, while the North West and Scotland trains would continue up the present WCML to Warrington. The line is relatively straight and the work needed to four track it would come to 22.25 kms. in total

From Warrington to Wigan there is just one section which needs to be fourtracked  of 4.56kms. Then the whole line from Crewe to Wigan would be fourtracked but with no great major works north of Crewe.. This total of updated lines comes to 26.81kms.

From Wigan the line runs up to Preston but would need to be fourtracked from Wigan to south of Euxton for 12.4 kms. This is about half the distance to Preston but would mean the line is fourtracked all the way to that station. What is problematic is the curvature of the WCML through Wigan North Western station (this is not a problem at Warrington Bank Quay) together with the length of the platforms for long HSR trains. These two points have not been mentioned at all in the command document produced by the DfT.


The  line from Crewe to Bamfurlong : HS2 Ltd. is proposing a completely new line to branch off the present  WCML north of Crewe to travel in the direction of Altrincham. One section would then turn left to pass east of Warrington to rejoin the WCML just south of Wigan at Bamfurlong (north of Golbourne). This section is unnecessary carving up of the countryside and marginalising Warrington which is an important provider of passengers for long distance services on the WCML (more than Wigan). The HS2 proposal is 49.2kms. while the WCML alternative is 50 kms. The latter route, however, is cheaper and much less disruptive.

From Crewe to Manchester the HS route goes along the same line to Altrincham where it turns right just below the M56 motorway towards Manchester airport. The M56 then turns north east and here where the HS2 crosses the motorway, between Warburton Green and Davenport Green, an interchange station is planned. This would be on the left side of the motorway some distance from the airport terminals and in my opinion is a very bad option. 

If the WCML is taken from Crewe through Sandbach, Holmes Chapel and Wilmslow the line can branch off left along the existing tracks into the airport to stop at the existing terminal station. Better it would make it for the line to continue west out of the airport to then turn northwards to follow the proposed line through Didsbury to Piccadilly. This extension through the airport does not have to be particularly disruptive as it could be laid between the motorway link road and  terminal 2 - even better would be for the rail to go underground just at this point before turning right towards Manchester. To make the whole line from Crewe to the airport four track would require upgrades of two sections: one from Sandbach through Holmes Chapel of 13.7 kms. while the other section is from Chelford through Wilmslow into the airport of 14.0 kms.

The HS2 line from the airport into Manchester from this point goes undergound to emerge just north of Longsite before entering Piccadilly. I agree with this route. This line only needs to  be two track. It should be remembered that the lines entering Manchester are multiple from Crewe and Stafford so give various options in case of need - accident or maintenance.  In that case just one line need be four track while the others can remain two track.



HS2 Ltd´s proposal for the route into Piccadilly from Crewe means 50.7 kms. of new construction added to the extension of 26.54 kms. to Wigan  . My proposal to build a new line from the airport into Piccadilly means just 16.2 kms. of new construction. This is a significant saving to achieve better results.

The total of new HS2 construction on the two branches from Crewe to Manchester Piccadilly and Wigan come to 77.24kms. On the other hand the improvement of the WCML through Warrington to Wigan plus the lines from Crewe to Manchester Piccadilly mean just 16.2 kms. of new construction plus 54.51kms. of upgraded lines. The added advantage of the second option is that the fast line actually goes through Manchester airport (and not stop at some considerable distance from it), the potential traffic to/from Warrington is included, and also of paramount importance, unnecessary scarring of the landscape is avoided. It should not be forgotten also that Warrington Bank Quay is the transit point for Chester and North Wales for passengers from the north.




3) - HS2 Birmingham to Leeds (and the MML corridor):


In this section we must subdivide the line into four parts:

A)- Birmingham to East Midlands:
The HS2 line leaves Birmingham just north of the Water Orton line into the city centre to branch off northeastwards parallel to the M42 and A42. Having passed Ashby-de-la-Zouch it then passes under East Midlands airport to end up at Toton (to the west of Nottingham). This new section from Birmingham city centre to Toton comes to 70 kms.
 While this blogger agrees with the route in general terms I would like to point out some details.
I see no need for the line to pass under East Midlands airport at all. It is unnecessary expense. It could curve round south of Kegworth (instead of north) to join the Midland main Line (MML) just south of the East Midlands airport station. In that case if the HS2 line stops at Birmingham airport instead of another station on the other side of the National Exhibition Centre, it would then stop at East Midlands airport station thus connecting the two airports. Connectivity is what we strive for, do we not?
I consider a stop at the East Midlands airport necessary for services to Derby and onwards, as will be shown later, but also for services on other classic lines to other population centres north of Nottingham.
One point to bear in mind is the desire, or not, to leave the door open for fast regional services (such as SOUTHEASTERN ´s from North Kent into St.Pancras on HS1)as well as  HSR intercity services. This would be done if the demand were not so great for the intercity services while there could be a strong demand from  intermediate population centres. Then a stop could be built at Ashby-de-la-Zouch. 
My last point here is to criticise the choice of Toton as a stop, which only promotes car usuage. but I will develop that in a moment.


B)  East Midlands to Stoke-on-Trent:
On the map I have published (courtesy of Google Earth), you will notice that I have included a line to Stoke-on-Trent. A link from the MML (newly electrified) to Derby is a must, without question. The point is this. If you improve the line from Derby to Stoke then you can offer another entrance into Manchester. The present service is slow and not competitive. However, with improved times you can offer alternative services, serving important population centres (including between themselves), and direct into St. Pancras for HS1 services to Paris and Brussels. East Midlands Trains would thus be in a position to offer realistic competition to Virgin Trains (assuming the same operators are the franchisees in the future).

As can be seen on the map two short upgraded sections  (meaning to four track) would be needed from East Midlands airport to Derby (15.8 kms.) and from Blythe Bridge into Stoke (11 kms.). The section between is too curvy to be used as a fast line so a two track fast line of new construction would be built of 41 kms.. Such a new line would improve connecting times from Stoke (and thus from Manchester) to East Midlands (and thus St.Pancras). The building of this can be much quicker than HS2 thus dampening down demand on the WCML and offering alternative capacity in a much shorter time span. The savings on the envisaged investment (as mentioned before) for the destructive swathe through Cheshire could be devoted to this project.

C) East Midlands to Leeds:
The line from East Midlands to Leeds is perhaps the most important and most needed of all those proposed in this group. However, from where it leaves and which cities it touches determine its route which is not necessarily the best available.

The idea is for the HS line to follow the line of the M1 motorway  to Duckmanton (to the east of Chesterfield) from where it would continue north to go midway through Sheffield and Rotherham rejoining the line of the M1 just south of Meadowhall. From there it would branch off the M1 to go past Cudworth, Royston, Normanton and Mickeltown. From there it turns left along the river then south of Hunslet into the centre of Leeds.
The York branch would continue north from Mickeltown to follow the line of the M1 to the north of Garforth and Mickelfield, and from there to join the Leeds-York mainline north of Church Fenton.
This involves totally new construction of almost 135 kms.

South and West Yorkshire has a plethora of rail lines constructed in the 19th century which do not all serve the needs of the 21st century. The best route to Leeds is through Wakefield from Doncaster and the ECML. This route will continue to compete with the HS2 route through Sheffield. It does not subtract, however, for the need to mark a fast line through south and west Yorkshire to Leeds.

The basic errors of the proposed line is to have the East Midlands station at Toton, outside Nottingham, the South Yorkshire station at Meadowhall (which is nearer Rotherham than Sheffield) ending in a terminus at Leeds New lane, while the main line continues north ignoring Leeds to join the ECML on the way to York. Of course, one decision leads to another which eventually determines the whole route´s trajectory. Thus one error leads to another. It is necessary, therefore, to look at the basic premises.

A completely new line, completely separate from any other is a basic error. It is extended throughout the whole HS2 project but is totally unnecessary.  Obviously if that is the premise then the alignment draws itself. HSR trains can, do and should run on classic lines as well.

Out-of-town stations are not acceptable.These Parkway stations are based on the idea of driving to the station and parking there. This error should have been recognised by now. It promotes the use of the car (a heavily polluting vehicle) just for the benefit of those who own a car or who have access to one for journeys. It ignores the sector of the population which does not benefit from the use of the car. Public road transport is ignored. Access to the fast rail lines should be in city centres - this is where public transport goes. Point to point travellers want to go to city centres for business, pleasure or onward travel. We want to ensure that city centres remain living and vibrant  thus helping their continual renovation.  Parkways do not do this. Thus the premise is so very wrong.

What is to be done?  If we start the HS2 line from East Midlands airport then it should be taken through Nottingham. Firstly along the upgraded classic line then from Attenborough station the line would curve first south then northwestwards under the city centre with  the station underneath the present city centre station. From there this new line would go northwest to emerge overground between Nuthall and Bulwell. Then on it would run next to the M1 motorway to just south of Bolsover  where it leads to Sheffield entering a tunnel on the outskirts of the city emerging again near Kenninghall Road to connect to the classic line into the Sheffield city centre station. the line then runs on the classic line through Meadowhall and then left alongside the M1 to emerge north of Chapeltown  before the end of the tunnel and then continue to the west of the M1 along a new line to Barugh Green where it rejoins the classic line. From there the upgraded line continues north to Horbury where a new section is constructed past Tingley to rejoin the classic line east of Morley. Then the upgraded line leads us into Leeds(main station).

D)   Leeds to York:
 HS2 Ltd. envisages a branch off the line to Leeds to go to Church Fenton to service intercity trains to York and the North East. What is conveniently forgotten and not mentioned in the 108 page command document   is that the electrification of the Liverpool (via Chat Moss) line to Manchester Victoria is to be extended to Leeds and on to York. This will enable the Transpennine trains to travel under wires from Liverpool to Newcastle. Why is most of this investment from Leeds to York going to be ignored and wasted?

The conclusion reached is that, of course, a new branch line has to be built because the decision to run Leeds trains into a new station has already been made. This is scandalous. Unnecessary contruction (19.7 kms.) thus unnecessary expense. What is wrong with running any Teeside or Tyneside trains through Leeds main station? The question of a new station in Leeds is the moot point. A new service/maintenance depot will be needed without doubt. That does not mean a new station by any means. There are accessible  yards available for conversion at Hunslet, or land for a new depot at Kirstall, or even other places. Destruction of existing buildings at New Lane is unnecessary and expensive in the city centre.



The four Main Line Rail from London northwards:
In the previous blog (the first in this series) I mentioned the ECML and WCML and how they could be upgraded to achieve significant savings in time for services to the  North East and Edinburgh, on one side and to the North West and Glasgow on the other.
The picture below illustrates how HS2 fits in with these two routes plus the Chiltern Line and MML.
It can, thus, be seen that the four routes should really be taken together and how each can aid the others. This way capacity problems can be achieved all together. HS2 is then seen to be part of these but not separate from them so should not be treated separately.

The four Main Line Rail Corridors from London northwards (with HS2)




Conclusions:
The remarks here will be limited to the four main trunk routes with HS2.

HS2 is based on assumptions, such as having a dedicated separate line from terminus to terminus, which make the idea inflexible, ridiculously expensive and obviously does not consider any extensions further north. Any other considerations except the ECML and the WCML from York and Preston northwards are uneconomic, most likely not to be built, unworkable and, therefore, unacceptable. The solutions to that I have given in the previous post.

Phase One - the Chiltern Route to Birmingham - could have been drawn closer to the Chiltern Line itself but since the idea is to have a separate line having no relation to other lines except at the Birmingham end then it results in being isolated. This would be a gross error if ever an accident happened (heaven forbid) or when the line needs maintenance. The whole system would be closed. An illustration of this has been the closures of the MML and the ECML the last few days because the overhead lines came down. As explained in Railnews on 14th and 20th February 2013 respectively .................
"Major delays after overhead wires collapse"
 "Second overhead line failure strands hundreds"
............... and these two lines are major interconnected ones. Can you imagine the troubles caused on HS2 with no alternative routes to use? This would be an invaluable promotion for airline use.

The idea of fast lines must be, out of necessity, four tracks per corridor - two for intercity and two for regional traffic. They do not have to be running together for the whole length but must be connected for the reasons stated previously. That way they can be run separately but do not carve up the countryside as much as a completely new line.

I have said before and repeat that the station at Euston means unnecessary tunnelling and housing destruction in London - running the line into Paddington is quite sufficient. The placing of an out of town Parkway station nowhere near anywhere anybody wants to go has no justification. Connectivety is the key - this means using the airport station at Birmingham (it is meant to be a through station anyway). Also what should be mentioned is that all the trains to Birmingham need not necessarily terminate there - the command document admits this. Some will continue elsewhere to Woverhampton or Shrewsbury or some other place - therefore, they will need to go through a through station such as New Street. Is Curzon Street so necessary?

Phase Two: The extension to Manchester is a totally, superfluous, elephantine, expensive project dreamed up by consultants imprisoned by their narrow/constricting briefs and a scandalous destruction of countryside just where the options of entry to Manchester are multiple and so flexible. They are easily expanded without destroying so much green land.

The extension to East Midlands is a totally different question. It is quite a necessary addition to the national network. This is especially true when you consider a Southwest Northeast axis from Bristol to the North east. Is it so necessary now? I doubt it.  Of much more importance is the upgrade of the MML to the East Midlands airport. Add to this the extensions to Derby, Stoke and Manchester and then you are providing real alternatives(and competition) to the WCML.

The extension northwards must go through Nottingham - the city centre is where people want to travel. The same I say for Sheffield and into Leeds city centre. Through trains would go to Teeside or Tyneside making the spur to York superfluous, as well as the separate city terminus. The command document itself says "...the Government´s initial preferred option for the connection would also enable trains to continue to destinations further north on the East Coast Main Line,...."(p.54)

It is astounding that the planners hide behind such phrases as " the level of demand for rail travel from the region (South Yorkshire) would not make it one of the larger markets for HS2.." "...serving South Yorkshire alone would support only an infrequent service."(p.50) All this, and more, is said, without any support, to justify an out-of-town station near Sheffield  while conveniently forgetting that at present to move south it is much quicker and more convenient to use the car on the M1 next door than take the train. Many passengers in the region already have decided to use the ECML services from Doncaster. The electrification of the MML (before more upgrading) will give a much better idea of passenger demand.

These are just examples but the command document is full of self justifying arguments, apparently based on whims more than facts. It seems that this project has reached a stage of being an unstoppable bulldozer of interests more than a really interesting project for the greater number and the greater good. It is time for a rethink, preferably with other consultants, under more moderate criteria.

Thus the important projects which should have priority are
a)  the electrification and upgrading of the MML to East Midlands airport station would mean 71.7kms. of upgraded track (to four)
b) the electrification and upgrade of the route East Midlands - Derby - Stoke (to connect into Manchester) This would mean 41kms. of new construction with 26.3kms. of upgraded line.
c) a new and upgraded line from East Midlands airport through Nottingham and Sheffield to Leeds. This would mean 31.75kms. of upgraded line(to fourtrack)  with 83.5kms. of new construction


These are much more realistic figures to achieve better results.


Please note:
These are previous thoughts on the subject of HS2R
http://trans-trax.blogspot.com.es/2010/02/fast-trax.html
http://trans-trax.blogspot.com.es/2010/02/fast-trax-3-and-where-do-high-speed.html
http://trans-trax.blogspot.com.es/2010_03_01_archive.html
http://trans-trax.blogspot.com.es/2010/03/fast-trax-conclusion.html
http://trans-trax.blogspot.com.es/2010/03/high-speed-rail-2-white-paper-1.html
http://trans-trax.blogspot.com.es/2010/03/high-speed-rail-2-white-paper-2-ermini.html
http://trans-trax.blogspot.com.es/2010/04/high-speed-rail-2-white-paper-3-west.html
http://trans-trax.blogspot.com.es/2010/04/high-speed-rail-2-white-paper-4-and.html
http://trans-trax.blogspot.com.es/2011_07_01_archive.html